Phenom 300E: Your new jet. Our management.
Delivery is booked. Who is preparing the operation? How essential.aero supported a new Embraer Phenom 300E from handover to entry into service, including PART-NCC manuals and approval coordination.
A new aircraft gives you plenty to look forward to. Getting the operation ready takes work well before the first flight. For this factory-new Embraer Phenom 300E, essential.aero supported delivery and entry into service, preparing the operating documentation and coordinating the required approvals on the owner’s behalf.
A handover date. A plan beyond it.
Taking delivery is a milestone. Entry into service prepares the aircraft for the way you intend to use it. Both need to be considered together, so the work on manuals and approvals progresses alongside the handover.
Our role in this Phenom 300E project connected those tasks. We supported the delivery and prepared the documentation for the owner’s non-commercial operation under PART-NCC, the rules that apply to the private operation of complex aircraft such as this jet.
Operations manuals written for the operation.
An operations manual needs to reflect how the aircraft will actually be used. It sets out responsibilities and the procedures the people running the operation will follow, including how flights are prepared and conducted.
We prepared PART-NCC operations manuals for this Phenom 300E operation. For the owner, that meant having the operating arrangements documented as part of the preparation for taking over the aircraft.
Clear decisions when equipment needs attention.
Even a new aircraft needs a plan for equipment faults. The Minimum Equipment List, or MEL, specifies which individual items may temporarily be inoperative, and under what conditions a flight may still take place. It also sets limits for rectification.
We prepared the MEL and coordinated its approval with the authority. This gives the crew and technical teams a defined basis for assessing an equipment fault. It does not replace the checks required for each flight.
Preparing for the airspace ahead.
RVSM approval covers operation in designated airspace with reduced vertical separation between aircraft, at altitudes commonly used by business jets. The aircraft’s technical capability and the operator’s approval are separate considerations.
For this project, we coordinated the authority process for RVSM as a specific approval under Part-SPA. The approval work formed part of preparing the Phenom 300E for the owner’s intended operation.
Your aircraft arrives. Our support continues.
This project brought delivery support and operational preparation together for a new Phenom 300E. The owner could discuss the aircraft’s handover with the same team coordinating its manuals and approval work.
That is how our aircraft management team approaches entry into service: connect the purchase and delivery with the responsibilities of ownership. If you are still choosing an aircraft, our aircraft acquisition support can help you consider the operating requirements before committing to a purchase.
By essential.aero • Published 2 August 2026
More Articles

Turning a Falcon 7X 2C Inspection into a Strategic Advantage
The 2C inspection on the Dassault Falcon 7X is one of the most complex events in an aircraft's lifecycle. See how we turned it into an opportunity with avionics upgrades, cabin refresh, and Ka-band Satcom installation.

Falcon 7X refurbishment: a fresh look, a familiar feel
An aircraft the owner knew well, ready for a new look. How essential.aero guided an interior refurbishment and complete repaint, with design decisions and budgets agreed with the owner and family office.
Your next aircraft. Managed from the outset.
Still choosing an aircraft, or already planning its delivery? Tell us where you are in the process. We can discuss the support you need for the handover and preparation of your operation.
Discuss your aircraft delivery